GDR TECHNICAL

SCENIC SPACE

Dimensions:

10 meters width of proscenium opening

10 meters from proscenium opening to backdrop

8 meters of height until the bars of spotlights

Consult if a reduction/adaptation is needed

FLOOR

Stage with a 0 % of inclination, wooden in perfect state without any irregularity, hole or unevenness

White dance floor (white linoleum)

BLACK BOX

Layout in streets of maximum 1.5 metres width

Rigging equipment:

White tulle for the frontal projection of video, which goes up during the performance

Two consecutive bars to hang a basket full of confetti

Installation time:  10 hours (including unloading).

Dismantling time:  1.5 hours (including loading).

In the event of a modification of those specifications, the installation time might vary according to the characteristics of the space, equipment

 

LIGHTING

SPOTLIGHTS:

Consult Lighting plan

CONTROL:

Minimum 36 digital channels of Dimmer 2.5 KW/C. and a power cord

Digital board with monitor

ALTRES:

Sufficient material to electrify all of the spotlights of the lighting plan as well as the different devices specified in this technical rider.

Four direct plugs like Schuko of 220V. on the stage

Important notes:

If the possibilities of the space and infrastructures do not fit with the required conditions, we please ask you to inform as soon as possible in order to plan other options. The layout of the equipment will be completed according to the attached plan. Any modification will have to be agreed on by the company and, if necessary, the plan will have to be redesigned.

SOUND

PA:

Has to be sufficient and adequate for the characteristics of the hall

CONTROL:

DIGITAL BOARD

SOUND PLAYBACK:

OWN COMPUTER

CHANNELS LIST:

 

 

1 violin (we will bring all the backline), either by cable or HF

2 L

3 R

MONITORS:

broadcast all the space in a homogenous way

INTERCOM:

1 BOOTH + 1 STAGE

ALTRES:

Sufficient material for the electrification and connection of the sound devices

The violin moves on a platform with wheels so we will need a power cord and a microphone wire long enough to cross the whole stage. If the line of the violin is HF then there is no need for microphone wire.

VIDEO
  •  Video projector mínimum 5000 lumens dlp
  •  

    Player of the computer company

  • VGA cable to DVD projector
PERSONAL
  •  2 drivers during assembly / disassembly and during the function.
  • 2 electric during assembly / disassembly and one for the function (must know perfectly table lamps).
  • 1 sound technician during assembly / disassembly and during the function.
DRESSING ROOMS
  •  Dressing rooms with sufficient capacity for 5 people. With WC, chairs, racks, showers with hot water, at least one type plug sockets 220 V. mirror and direct access to the stage.
  • Dressing room with one or two people with sufficient capacity to minimal equipment and at least one plug 220 V.
  • Bottled mineral water for the day of assembly and disassembly function.

 Contacts:

Rafel Febrer
mòb. 627599433 / rafelfebrer@gmail.com

 

 

 

 

Leave a Reply

Your email address will not be published.